Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 6 results ...

Billy, H and Iain, C (2011) Site manager safety training. Engineering, Construction and Architectural Management, 18(06), 2–.

Chuan, C and John, I M (2011) Characterizing entry modes for international construction markets: paving the way to a selection model. Engineering, Construction and Architectural Management, 18(06), 1–.

Erman Surya, B, Muhd Zaimi Bin Abdul, M, Rosli Mohamad, Z and Bambang, T (2011) Constructability improvement in sea water intake structure. Engineering, Construction and Architectural Management, 18(06), 4–.

Florence Yean Yng, L and Asanga, G (2011) Strategies for potential owners in Singapore to own environmentally sustainable homes. Engineering, Construction and Architectural Management, 18(06), 3–.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0969-9988
  • URL: http://links.emeraldinsight.com/journals.htm?articleid=1948965
  • Abstract:
    Purpose - The aim of this study is to investigate the strategies that are needed to enable potential owners to own environmentally sustainable homes. The specific objectives are to: (1) determine the extent to which potential home owners are willing to pay for homes that are environmentally sustainable; (2) uncover the green features that potential home owners are willing to pay for; and (3) provide recommendations on how more green features can be incorporated in homes. Design/methodology/approach - The survey research method was adopted, and data were collected using a specially designed structured questionnaire. Self-administered questionnaires were distributed to randomly selected potential home owners in Singapore.Findings - Based on the data received, the findings show that the majority of the respondents are willing to pay more to own an environmentally green building. However, they are very price sensitive and only willing to pay 1% more in upfront costs. The study found that the green features that potential home owners are willing to pay relates to siting for natural ventilation, provision of greenery, and water conservation. Originality/value - Several recommendations are offered on how to enable more features to be incorporated to homes owned by price sensitive individuals.

Ibrahim, A K M (2011) Risk matrix for factors affecting time delay in road construction projects: owners’ perspective. Engineering, Construction and Architectural Management, 18(06), 5–.

Mary, H and Graeme, N (2011) Factors influencing technical innovation in SME construction firms. Engineering, Construction and Architectural Management, 18(06), 6–.